Employers Agent, Ongar, Essex

Employers Agent, Ongar, Essex

Existing domestic garages to the rear of an established Housing Estate made way for this single storey building providing 6 self contained flats for people with learning difficulties and included a staff office, sleepover room with en-suite shower facilities and communal room. It was developed for East Thames and included extensive communal gardens provided for the benefit of the residents.

Employers Agent For a Residential Project, Romford, Essex

Employers Agent For a Residential Project, Romford, Essex

This £1.9M scheme was to deliver 20 one and two bedroom flats for a Shared Ownership as part of a larger residential/commercial development for East Thames Group. The seven storey block of flats was constructed using a bison concrete frame clad in coloured metal panels. To achieve Planning Conditions for car parking a Katopark car stacker was used.

Appointed Condition Surveyor for 1960s Block - Pimlico

Appointed Condition Surveyor for 1960s Block - Pimlico

A 1960’s residential apartment block. The residents were becoming increasingly concerned about the unexpected costs they had to pay out for adhoc building repairs. An example was water leaking into top floor apartments due to deterioration of the flat roof coverings and the ensuing costs and disruption. They felt they did not have an understanding of the state of their building; they could not plan maintenance or budget.

Planned Maintenance Programme for 400 Flats - Docklands

Planned Maintenance Programme for 400 Flats - Docklands

This prestigious property in Docklands is a modern apartment complex with in excess of 400 flats.  It has brickwork elevations, flat roofs and powder coated aluminium windows, doors and trims.  The internal common parts are extensive but are similarly unfussy.  As would be expected in such a building there is a substantial amount of M&E. It could be assumed that there is little to be done to maintain such a building. 

Planned Maintenance Cost into Annual Budget - Docklands

Planned Maintenance Cost into Annual Budget - Docklands

A very large apartment block in Docklands has a considerable amount of rainscreen cladding to the elevations.  This type of cladding has powder coated surfaces and many seams, mastic joint seals, gaskets, pop rivets and weep holes all of which have periodic maintenance and renewal needs.  Metcalfe Briggs used a large cherry picker to reach the ‘nooks and crannies’ of each elevation so that all building elements could be identified, the quantity accurately assessed and the maintenance regime defined.

High-Rise Survey and Planned Maintenance - East London

High-Rise Survey and Planned Maintenance - East London

A high rise apartment complex in Docklands presented particular difficulties to survey and complete a Asset Management Plan.  Tiered roof balconies and rising to 16 storeys meant external access using scaffold or a cherry picker was physically and economically impossible.  Instead rope access was chosen to get close to the elevations to understand the building’s construction and condition.

Appointed as Impartial Party Wall Surveyor - Beckton

Appointed as Impartial Party Wall Surveyor - Beckton

Metcalfe Briggs Surveyors were instructed to act as Party Wall Surveyor for the proposed retrofit in a two storey terraced house in Becton.   The works entailed the introduction of a mezzanine floor in the roof space, requiring supporting beams from the party walls and raising of the roof, a party structure between the adjoined properties.

Agreed Surveyor on Unstable Party Wall - Walthamstow

Agreed Surveyor on Unstable Party Wall - Walthamstow

A party fence wall between two owners had become unstable due to the construction and lack of foundations. The Building Owner had decided to take the wall down and re-construct. However, a detailed design and agreement on the reinstatement works was required beforehand. Following detailed investigations by East Thames, an engineer and Metcalfe Briggs Surveyors, a proposed scheme for repair was agreed.